Show/Hide

COVID-19 Information

For the latest updates on COVID-19/Coronavirus news affecting Broken Arrow, please visit BrokenArrowOK.gov/Coronavirus.

The Streets and Stormwater Department is structured in three (3) divisions. Streets is responsible for asphalt paving, base repair, filling potholes and dump truck support. The Stormwater Division is responsible for storm drain repair, mowing and tree trimming/removal, drainage and concrete repair and nuisance abatement. The Traffic Division maintains traffic signs, traffic and school zone signal systems, traffic calming devices and street markings.

Normal business activities such as patching of potholes and speed humps, traffic surveys, mosquito spraying, concrete repairs to roads and curbs, street sweeping, abatement mowing and snow/ice removal are always given top priority. Our citizens can be assured that their streets will be kept as safe as possible during times of hazardous weather.

Street Sweeping

The City owns and operates two street sweepers year round. Each part of the City is swept twice per year based on the following schedule.

Area Months Scheduled
1 South January July
2 South February August
3 South April October
4 South June December
5 South March September
6 South May November
1 North January July
2 North February August
3 North May November
4 North March September
5 North April October
6 North June December

Street Sweeping Map Index

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer