Hillside Drive Retaining Wall Replacement

  • Category:Engineering
  • RFP Number:20.163
  • Start Date:05/15/2020 8:00 a.m.
  • Close Date:06/08/2020 1:45 p.m.

The project includes removal of the existing approximately 700 feet long small block MSE retaining wall located along the north side of Hillside Drive approximately 1,600 feet west of 9th Street and construction of a new cast-in-place cantilever concrete retaining wall.  The Schedule A construction package consists of removal of the existing small block MSE retaining wall, geogrid reinforcement, granular drainage backfill, drain pipe, and any incidentals required for removal purposes as well as construction of a new approximately 653 feet long cantilever concrete retaining wall consisting of concrete, reinforcing steel, geosynthetic fabric, granular drainage backfill, drainage pipe, aggregate base and all other incidentals necessary for the completed new cantilever concrete wall installation.  Contract time for the project shall be One Hundred Eighty (180) calendar days.

Full Details:

20.163 Hillside Drive Retaining Wall Replacement (PDF)

Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer